The preliminary plans include “tactical” concrete sidewalks along the 3400-3500 blocks of Water Street, along with a two-way bikeway, a traffic roundabout and changes to on-street parking.
Because the changes have caused unacceptable congestion during evening rush hour, the BID and the District Department of Transportation are making three modifications, effective immediately.